MRT Non-Critical Notice

Notice ID: 63650
Notice Type: PSO
Critical: N
Notice Status Description:
Reqrd Rsp Desc: No Response Required
Response Date/Time:
Posting Date/Time: 2026-05-13 15:08:00.0
Subject: Planned Service Outages [May 2026 Calendar]
Notice Effective Date/Time: 2026-05-13 15:08:00.0
Notice End Date/Time: 2026-08-14 00:00:00.0
Notice Text:

Start Date

End Date

Title

Location

Maintenance

Impact

SPW

4/15/2026

11/1/2026

Station Automation

 Twelve Mile Compressor

Integrity Work

1

4/20/2026

6/1/2026

Unionville #1 engine

 Unionville

Annual Maintenance

1

5/1/2026

5/16/2026

Perryville Compressor Station Unit 5 Top End

 Perryville Compressor

Regular Maintenance

1

5/5/2026

7/10/2026

Carlisle Station Annual Maintenance

 Carlisle Compressor

Regular Maintenance

1

5/7/2026

7/30/2026

west point unit # 3 rod replacement

 Westpoint Compressor

Regular Maintenance

1

5/11/2026

5/18/2026

 Installing Ring Gear on units #5&7

 Fountain Hill Compressor

Other

1

5/11/2026

5/25/2026

Tuckerman Turbine Maint.

 Tuckerman Compressor

Annual Maintenance

1

5/13/2026

5/13/2026

ML3 Cleaning Pigs Glendale to Ft. Hill

 Pipe - Glendale

Cleaning Pig

1

5/15/2026

5/31/2026

Unionville EOS Shut in

Unionville

Other

8

62470

5/18/2026

5/18/2026

Westline Dixie to NGPL pigging

Pipe - Unionville

Cleaning Pig

1

5/18/2026

5/19/2026

St Jacob Storage Barrel Modifications YR 2

St Jacob

Other

1

5/18/2026

5/19/2026

ML 3 12 Mile to Ste Genevieve Hydrotest

Pipe - Bonne Terre

Integrity Work

1

5/18/2026

5/22/2026

ELECTRICAL SURVEY POPLAR BLUFF

 Popular Bluff Compressor

Regular Maintenance

1

5/18/2026

5/30/2026

Perryville Compressor Station Unit 1-1375

 Perryville Compressor

Regular Maintenance

1

5/19/2026

5/19/2026

Westline Dixie to Red River and river crossings

Pipe - Unionville

Cleaning Pig

1

5/19/2026

5/19/2026

10" IGT-1 Hill Creek - Hartford ILI - Cleaning & Gauge Tools

 Pipe - St Jacob

Cleaning Pig

1

5/20/2026

5/20/2026

Westline Red River to MP51

Pipe - Unionville

Cleaning Pig

1

5/20/2026

5/20/2026

ML2 cleaning Pigs Ft. Hill to Perryville

 Pipe - Fountain Hill

Cleaning Pig

1

5/21/2026

5/21/2026

10" IGT-1 Hill Creek - Hartford ILI – HR Combo

 Pipe - St Jacob

ILI Pigging Project

1

5/21/2026

5/21/2026

ML3 Cleaning Pigs Ft. Hill to Perryville

 Pipe - Fountain Hill

Cleaning Pig

1

5/21/2026

5/22/2026

Ft Hill Shutdowns & Alarms

 Fountain Hill Compressor

Annual Maintenance

8

62778

5/22/2026

5/23/2026

WESTLINE CLEANING PIGS UNIONVILLE TO PERRYVILLE

 Pipe - Unionville

Cleaning Pig

1

6/1/2026

6/2/2026

Poplar Bluff Condensate Tank

Poplar Bluff

Other

1

6/2/2026

6/2/2026

22" ML2 Mississippi River to Columbia M&R ILI Rerun

 Pipe - Columbia

ILI Pigging Project

1

6/3/2026

6/3/2026

Ft. Hill Line Cleaning Pigs

 Fountain Hill Compressor

Cleaning Pig

1

6/8/2026

6/9/2026

ALE Line-Columbia to MO Gas ILI Make Ready

Columbia

Integrity Work

1

6/29/2026

6/30/2026

MRT ML2 Black River to MP313_VS-V12Da Anomaly Dig

 Pipe - Twelve Mile

Digs

1

7/3/2026

7/18/2026

ML3 Poplar Bluff to Twelve Mile Scheduled Anomaly Digs

 Pipe - Twelve Mile

Digs

1

7/6/2026

7/18/2026

Perryville Compressor Station

 Perryville Compressor

Regular Maintenance

1

7/14/2026

7/14/2026

18x20x22" ALLN A-75 to Horseshoe Lake ILI - GEO

 Pipe - Columbia

ILI Pigging Project

1

7/16/2026

7/16/2026

18x20x22" ALLN A-75 to Horseshoe Lake ILI – MFL

 Pipe - Columbia

ILI Pigging Project

1

7/20/2026

8/1/2026

Perryville Compressor Station Unit 1-1375

 Perryville Compressor

Regular Maintenance

1

7/21/2026

7/22/2026

ML2 Black River Crossing to Lake Creek Crossing Anomaly Digs

 Pipe - Twelve Mile

Digs

1

8/3/2026

8/21/2026

Meramec Receiver Barrel & Piping Modifications

 Pipe - Columbia

Integrity Work

1

8/24/2026

10/23/2026

ML2 Class Location Relay

 Pipe - Twelve Mile

Integrity Work

1

9/9/2026

9/14/2026

ML1 Joachim Creek HDD

Pipe - Bonne Terre

Integrity Work

1

9/14/2026

9/15/2026

Mississippi River Lines Abandonment

Pipe - Bonne Terre

Other

1

10/1/2026

10/2/2026

Columbia M&R Regulator Replacement

Columbia

Valve Maintenance

1

10/1/2026

10/2/2026

ML2_Twelve Mile to Ste Genevieve-100 Line

 Pipe - Twelve Mile

Integrity Work

1

10/3/2026

10/4/2026

ML3_Twelve Mile to St Genevieve-100 Line-VS-V17 - Hydrotest

 Pipe - Twelve Mile

Integrity Work

1

10/3/2026

10/4/2026

ML3_Twelve Mile to St Genevieve-100 Line-VS-V79 - Hydrotest

 Pipe - Twelve Mile

Integrity Work

1

12/1/2026

12/2/2026

ML2 Class Location Relay

 Pipe - Twelve Mile

Pipe Replacement

1

12/1/2026

12/2/2026

ML1 Joachim Creek HDD

 Bon Terre Tower

Pipe Replacement

1

12/1/2026

12/2/2026

Meramec Receiver Barrel & Piping Modifications

 Pipe - Bonne Terre

Pipe Replacement

1

1.  No capacity impact is expected at this time.

2.  Coordinating with necessary loads.

3.  Based on historical and current throughput, no capacity impact is expected.  In the event that nominations increase significantly, restrictions may become necessary.

4.  Coordinating maintenance with interconnecting pipes to minimize customer impact.  No capacity impact is expected at this time; however, if operating conditions change, affected parties will be notified.

5.  Affected production notified of shut-in during work.

6.  Customers may experience pressure fluctuations, but no capacity impact is anticipated.

7.  Based upon customer nominations, restrictions may become necessary.

8.  Based on all available information, capacity will be impacted.  Capacity reductions will be done in accordance with the provisions of MRT's tariff regarding scheduling and interruption of services.